Description
What’s included: $5,490 flat truck rate covers fuel and deadhead, size/weight limits (800 lbs, 5’7″ bed, 60″ height max — larger loads require the trailer at $6,865), layover ($375) and detention ($140/hr — 30 min free at pickup, 30 min free at drop-off, tracked separately) apply on top if triggered.
The run from Vancouver
Prince George is about 787 km out, and a realistic one-way running time is 10 to 11 hours. The route goes Highway 1 or the Coquihalla to Cache Creek, then 441 km north on Highway 97, the Cariboo Highway. That northern leg is the long, quiet part of the trip — mostly two-lane, with a rebuilt expressway section around 70 Mile House, and long gaps between services. Prince George sits at the crossing of Highway 97 and Highway 16, which is why almost everything moving into northern BC passes through it. Loads continuing west to Terrace or north to the Peace add another 400 to 600 km beyond this point, so we plan those as two-day runs from the start.
What moves here
Be aware that the pulp sector here has contracted sharply and any older information is likely wrong. Canfor permanently closed the pulp line at its Prince George Pulp and Paper mill in early 2023, removing 280,000 tonnes a year and about 300 jobs. It then announced the permanent closure of the Northwood pulp mill on 14 July 2026 — another 300,000 tonnes of NBSK and roughly 300 employees — with the wind-down completing in late 2026. The city’s freight base now leans on its role as the service and distribution centre for northern BC, on health care and the university, and on rail: CN runs a major yard here and opened an intermodal facility in 2007 feeding the Prince Rupert corridor. The airport is the outlier worth knowing about — see below. The city counted 76,708 people in 2021, with the wider census agglomeration at 89,490.
Scales and seasonal limits
Both Prince George area stations, Prince George North and Red Rock, are currently listed as temporarily closed. The working scales on this corridor are Quesnel at 3870 Highway 97 North and Vanderhoof west on Highway 16. BC posts spring load restrictions as a percentage of legal axle loading — 100%, 70% or 50% — applied only above 5,500 kg licensed GVW. Northern restrictions run materially longer than the south: the Fort George service area did not go fully unrestricted until 29 June in 2026. Winter tires or chains are required on Highway 97 through here from 1 October.
Local fun fact
The airport has a runway out of all proportion to the city — 11,450 feet by 200 feet, opened in February 2009 as a 4,000-foot extension costing $36 million, and the third-longest commercial runway in Canada. It was built for freight. The idea was to let Asia-to-North America cargo aircraft on Great Circle routes stop here for fuel instead of Anchorage or Fairbanks, with 24-hour operations and no noise curfew. Mr. PG, at the junction of Highways 97 and 16, is the easiest landmark to route from; both his original and current heads were built from a spherical plastic septic tank.





Reviews
There are no reviews yet.